Inspection Consultants to the Oil and Gas Industry Key Terms

Terminology for inspection consultants to the oil and gas industry can help your business

By Nikki Davis
Inspection consultants to the oil and gas industry key terms can impact many businesses and people. From the owners of the mines to workers, what consultants have to say about the operations of their fields has to be understood from the ground up in order to be implemented. Terminology also has to be clearly communicated amongst colleagues to and to clients, so knowing proper terminology for the companies providing their consulting services is also vital.

Inspection consultants to the oil and gas industry key terms include many pieces of equipment. They can also include techniques as well. Whatever the word, phrase or acronym, though, having a firm grasp on the meaning will help you better represent your business and communicate with others.

 

Blowout preventer (BOP)

Blowout preventers (BOP) are used on gas and oil minefields to control pressure on the wellhead in the annular space between the casing and drill pipe or tubing. This is done during the drilling, completion, and workover operations.
Try: Learn more about oil blowout preventers from the United States Department of Labor Occupational Safety & Health Administration (OSHA).

Casing

Gas and oilfield casing is the metal pipe that is inserted into a wellbore and that is then cemented in place. This protects both subsurface formations, such as your groundwater and the wellbore.
Try: Find out more about oilfield piping and casing from Lafoy Pipe & Equipment.

Development well

A development well is a well drilled that is made to complete the desired spacing pattern of production. It is generated in a proven oil or gas area to a known productive area.
Try: Learn about development wells in the "Gulfsands Makes Headway on Khurbet East Drilling, 3D Seismic Program" from Rigzone.

Enhanced oil recovery (EOR)

Enhanced oil recovery (EOR) happens when companies look to increase the amount of oil removed from a reservoir. They can do this by injecting a liquid (generally water or surfactant) or gas (generally nitrogen or carbon dioxide) into the well to repromote production.
Try: Find out about Enhanced oil recovery (EOR) using biosurfactant from Biosurfactant Enhanced Oil Recovery.

P&A (plugged and abandoned)

When a well is P&A (plugged and abandoned), it has been completely depleted or dried. Subsequently, it is also filled with cement and all surface equipment is taken away.
Try: Look at a Plug and Abandon (P&A) Due To Corroded Tubing case study from TAM International.

Stimulation

Stimulation is one of many processes used to enlarge old mining channels or to create new ones in the hopes of enhancing oil production. This can be done by either acidizing and fracturing.
Try: Learn more about oil well stimulation from oilprimer.com.


Find Pre-Screened Vendors

Compare quotes and save: