Your free business.com+ membership unlocks exclusive tech deals and advisor support
Join Free
BDC Hamburger Icon

Menu

Close
BDC Logo with Name
Search Icon
Search Icon
Advertise with us
Advertising Disclosure
Close
Advertising Disclosure

Business.com aims to help business owners make informed decisions to support and grow their companies. We research and recommend products and services suitable for various business types, investing thousands of hours each year in this process.

As a business, we need to generate revenue to sustain our content. We have financial relationships with some companies we cover, earning commissions when readers purchase from our partners or share information about their needs. These relationships do not dictate our advice and recommendations. Our editorial team independently evaluates and recommends products and services based on their research and expertise. Learn more about our process and partners here.

The Best Email Marketing Services and Survey Software of 2026

Take your marketing to the next level with email campaigns, newsletters and surveys via Mailchimp or another top platform.

Mark Fairlie
Written by:
Mark Fairlie, Senior Analyst
author image
Editor verified:
Chad Brooks,Managing Editor
Last Updated Jul 17, 2026
Business.com earns commissions from some listed providers. Editorial Guidelines.
8.5 /10
Editor's rating
Best for Email List Management
  • From $9 per month
  • Starts at 500 contacts and 5k sends
  • 30-day free trial
Visit Site
Links to iContact
9.1 /10
Editor's rating
Best for E-commerce marketing
  • From $16 per month
  • Starts at 500 contacts and 6K sends
  • 14-day free trial
Visit Site
Links to Omnisend
9.0 /10
Editor's rating
Best for Deliverability
  • From $12 per month
  • Starts at 2,500 monthly emails
  • 30-day free trial
Visit Site
Links to Campaign Monitor
9.0 /10
Editor's rating
Best for Larger Businesses
  • From $14 per month
  • Starts at 5k contacts and 30k sends
  • 30-day full-featured free trial
Visit Site
Links to Campaigner
9.1 /10
Editor's rating
Best for Data-Driven Marketing
  • From $20/month
  • Starts at 5,000 monthly emails
  • Free plan
Visit Site
Links to Klaviyo
Table Of Contents Icon

Table of Contents

Open row

At business.com, our marketing software experts and operations analysts routinely evaluate the essential marketing tools and services small and growing businesses require, while providing playbooks for executing social media campaigns, email marketing newsletters, text message marketing promotions and more. Our guides are infused with advice from real digital marketing experts, project managers, SEO professionals, social media directors and advertising consultants. Our rigorous review process includes vendor interviews, product demonstrations, firsthand testing and head-to-head comparisons. After each assessment is completed, it’s verified by a top editor to ensure accuracy and objectivity. Learn more about our editorial process.

Tip Bulb

How We Decided

When it comes to email marketing services and survey software, we tried a number of platforms and judged their user-friendliness, functionality, integrations and more. We looked for features like customizable templates, A/B testing, automated workflows,...

MoreMore

When it comes to email marketing services and survey software, we tried a number of platforms and judged their user-friendliness, functionality, integrations and more. We looked for features like customizable templates, A/B testing, automated workflows, drag-and-drop editors and campaign analytics. Pricing and plan options also factored into our ratings, as did customer service quality.

25

evaluated

14

researched

6

chosen

When it comes to email marketing services and survey software, we tried a number of platforms and judged their user-friendliness, functionality, integrations and more. We looked for features like customizable templates, A/B testing, automated workflows, drag-and-drop editors and campaign analytics. Pricing and plan options also factored into our ratings, as did customer service quality.

25

evaluated

14

researched

6

chosen

Compare Our Best Picks

BDC Ribbon
Our Top Picks for 2026
iContact
Omnisend
Campaign Monitor
Campaigner
Klaviyo
HubSpot
Mailchimp
GetResponse
Constant Contact Email Marketing
Freshworks Freshmarketer
Rating (Out of 10)8.59.19.09.09.19.29.49.39.49.2
Best use case

Email list management

E-commerce marketing

Deliverability

Larger businesses

Data-Driven Marketing

Bundled marketing solution

Beginners

AI-powered automation

Small businesses

Marketing integrations

Starting monthly price for paid plans

$9 per month

$16 per month

$12 per month

$14 per month

$20 per month

$15 per month

$13 per month

$15.58 per month

$12 per month

$15 per month

Free trial

30 days

14 days

30 days

30 days

Free plan; 60-day free email support

14 days

1 month

30 days

30 days

21 days

Inclusive monthly sends (at basic plan)

10x contacts

6,000

2,500 per month

30,000 per month

5,000 per month

5,000 daily

5,000 per month

Unlimited

5,000 per month

20x number of contacts

A/B testing

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes (subject line only)

No

Review Link
Scroll Table

Reviews

Editor's Rating: 8.5/10
Visit Site
Links to iContact

iContact is a solid email marketing platform designed for small and medium-sized businesses that prioritize simplicity and hands-on support over advanced feature depth. We found it especially useful for small teams that value human support and simplicity.

The drag-and-drop editor and library of over 35 customizable templates make it easy to create professional-looking campaigns without any design or coding expertise. We especially liked the Smart Sending feature, which optimizes email delivery timing based on each subscriber’s past engagement patterns, and the built-in SpamCheck tool, which scans outgoing messages to help ensure they reach inboxes rather than spam folders.

iContact

During our review, we found iContact’s drag-and-drop email builder intuitive; we were able to build a serviceable newsletter in about 15 minutes and with minimal background knowledge of the platform. iContact’s strong selection of templates and themes provided a nice jumping off point even though our tester lacked design experience.

The Standard plan ($9/month) covers the essentials for getting started, including pre-designed templates, a drag-and-drop editor, and landing page templates. The Premium plan ($16/month) adds meaningful upgrades including unlimited users, social media posting, an AI content assistant, unlimited landing pages, and more advanced automation capabilities. For businesses with specialized requirements, a custom tier is also available with tailored features and dedicated support. All paid plans include access to a dedicated Success Manager and award-winning technical support via phone, email, and live chat — a level of guided support that most competitors reserve for their higher-priced tiers.

Where iContact falls short is in the depth of its automation and integrations. Businesses that need complex multi-step workflows, advanced tagging or extensive third-party integrations may find the platform limited compared to rivals like Mailchimp or HubSpot. The platform offers around 35 direct integrations plus Zapier and LeadsBridge connectivity, which may not be sufficient for organizations with complex tech stacks.

iContact’s pricing is based on the number of subscribers and is offered at monthly or annual rates, with a 15% discount for annual prepayment. Nonprofits can receive a 20% discount by emailing proof of 501(c)(3) status to billing@icontact.com.

PlanPriceFeatures
StandardStarts at $9 per monthPre-designed email templates, drag-and-drop editor, landing page templates, basic automation, A/B testing, SpamCheck, real-time analytics, dedicated Success Manager
PremiumStarts at $16 per monthEverything in Standard plus: unlimited users, social media posting, AI content assistant, unlimited landing pages, advanced automation and segmentation
CustomContact for pricingTailored feature set, custom sending volumes, dedicated support, personalized solutions
  • The platform's intuitive interface and drag-and-drop editor make it one of the easiest email marketing tools to learn, even for users with no prior experience.
  • Every paid plan includes a dedicated Success Manager who provides strategic marketing guidance — not just technical support — which is a standout benefit for small teams without in-house marketing expertise.
  • Smart Sending and SpamCheck work together to improve both deliverability and engagement rates without requiring manual optimization.
  • Automation capabilities are adequate for basic workflows like welcome sequences and drip campaigns but fall behind specialized competitors for complex, multi-step automation.
  • With roughly 35 native integrations (plus Zapier and LeadsBridge), the platform's connectivity options are more limited than what rivals like Mailchimp or HubSpot offer.
  • Subscriber-based pricing can escalate quickly as your contact list grows, and some users report that pricing has increased notably over time.

TrustRadius: 6.8/10 (97 reviews)

“iContact is a great tool for all levels of expertise and has an intuitive interface that allows for all users to have confidence in running, designing, and analyzing email marketing campaigns,” one user wrote. Another noted, “Price, support, ease-of-use and familiarity are the top four reasons I would renew my agreement with iContact.”

Omnisend logo
Editor's Rating: 9.1/10
Visit Site
Links to Omnisend

Omnisend makes it easy to use email marketing to support your e-commerce company, allowing you to quickly build and send shoppable emails highlighting your business’s products. The product recommender feature can automatically pull in your best-selling or newest items or select personalized products based on a customer’s order history. We love that there are prebuilt automated workflows for sending cart abandonment emails and confirmations for purchase and shipping, but you also have the option to create your own. You can also send your contacts unique coupon codes.

One fun e-commerce tool is what Omnisend calls “Wheel of Fortune” — a pop-up that lets your online store visitors spin a virtual wheel for a discount or other prize in exchange for providing their email address. Plus, with the platform’s sales and performance reports, you can get insights into which email campaigns drive the most revenue, which is valuable for optimizing your marketing efforts. E-commerce businesses will also appreciate the ability to sync their contact segments with Facebook, Instagram, Google and YouTube customer profiles for effective retargeting.

Omnisend Wheel of Fortune

Omnisend’s “Wheel of Fortune” incentivizes potential customers to sign up for your email list. Source: Omnisend

In addition to its two-week free trial, Omnisend has a free plan that allows up to 250 contacts and 500 email sends per month, an ideal option for businesses with limited email marketing needs. For higher usage caps, you’ll want to purchase one of the paid plans outlined below.

PlanPriceFeatures
Standard$16 per month500 contacts, 3,000 emails per month, unlimited web push notifications, 1,000 published reviews with Shopify, $1 in free SMS credits
Pro$59 per month2,500 contacts, unlimited emails, unlimited web push notifications, unlimited published reviews with Shopify, $59 in free SMS credits, advanced reporting
CustomCustom pricingCustom contacts, unlimited emails, unlimited web push notifications, unlimited published reviews with Shopify, advanced reporting, free migration, dedicated onboarding specialist
  • Omnisend's Free, Standard and Pro plans include almost all the same features and only differ in usage caps; some rivals restrict its best tools to higher-tier plans.
  • The platform integrates with popular e-commerce solutions, including Shopify, WooCommerce and BigCommerce.
  • All customers have access to 24/7 email and live chat support.
  • Omnisend sometimes charges for contact list cleanups.
  • Though the vendor conveniently offers email and text message marketing in one platform, SMS messaging costs are expensive if you have high-volume needs.
  • You have to spend at least $400 per month to have access to a success manager.

Omnisend has a TrustScore of 4.3 stars out of five based on just over 300 reviews on Trustpilot. One of the testimonials says, “Omnisend is an outstanding email marketing platform, especially for Shopify users. Their seamless integration makes campaign management effortless, and their innovative features constantly evolve to meet the needs of modern e-commerce.”

Campaign Monitor logo
Editor's Rating: 9/10
Visit Site
Links to Campaign Monitor

There’s little point in signing up for an email marketing service if the vendor can’t reliably deliver your emails. Fortunately, Campaign Monitor excels at deliverability. With the software’s segmentation tools, you can create custom email lists to send messages tailored to specific audience groups. The real-time analytics track the deliverability rate for each campaign, and we love that for all packages, including even the free plan, Campaign Monitor provides deliverability support, vowing to investigate and resolve any delivery problems that occur. You can also sign up for a best practices training session with one of the company’s deliverability experts to ensure you’re giving your email sends the best chance of reaching subscribers’ inboxes.

In addition to traditional email marketing features like customizable templates, A/B testing and e-commerce integrations, we were impressed that Campaign Monitor also offers some cutting-edge functionality. We like the new Link Review tool, which automatically checks your email to make sure it doesn’t include any broken links, and the AI Writer, which generates optimized content for your campaigns. There’s even a tool that will help you determine the best subject lines.

Campaign Monitor contacts

Campaign Monitor lets you drill down into the details for each of your contacts. In this example, the subscriber is segmented into nine different contact lists. Source: Campaign Monitor

The prices below may increase based on the size of your contact list.

PlanPriceFeatures
Lite$12 per monthThree users, unlimited contacts, 2,500 monthly emails, drag-and-drop builder, template library, segmentation tools, image gallery, signup forms, mobile optimization tools, A/B testing, preference center, limited automated emails, campaign assistance, AI Writer, Link Review, analytics, API access, email support
Essentials$29 per monthEverything in the Lite plan, plus unlimited users, unlimited automated emails, design and spam testing, countdown timer, time zone sending, priority email support
Premier$159 per monthEverything in the Essentials plan, plus advanced engagement segments, send time optimization, email section locking, advanced link tracking, premier email support, phone support
  • Campaign Monitor provides dedicated deliverability support.
  • The vast majority of features are available with the entry-level Lite plan.
  • You can also sign up for the vendor's SMS marketing platform for text message marketing.
  • There is a significant — and possibly financially prohibitive — price jump between the two lower-tier plans and the top-tier Premier offering.
  • Multiple customers have reported struggling with the software's HTML coding.
  • Only users on the most expensive plan have access to phone support.

On Trustpilot, Campaign Monitor has nearly 200 reviews and a TrustScore of 3.8 stars out of 5. One customer stated, “Campaign Monitor is a great email marketing platform. Our reach and open rate has improved immensely since using CM.” Another said, “Campaign Monitor support is timely and clear — exactly what support should be!”

Editor's Rating: 9/10
Visit Site
Links to Campaigner

Campaigner stands out as the ideal email marketing solution for larger businesses, primarily due to its ability to handle extensive contact lists across all pricing tiers, and offering six times the number of contacts for monthly email distributions. For companies that require large-scale email campaigns, this capacity is indispensable.

Campaigner’s Essentials plan, which starts at $14 per month, includes the tools small businesses need to get started with email marketing. Meanwhile, the Advanced plan, which starts at $35 per month, is equipped with robust features tailored for bigger operations, such as dynamic email content, automated workflows, and, at higher pricing levels, in-depth purchase behavior analytics.

Even with these sophisticated features, Campaigner remains user-friendly, requiring only a brief learning curve for new users. The platform’s drag-and-drop functionality across its various tools makes it easy to design visually appealing emails, set up automated workflows, and create triggered email sequences. Additionally, we found the inclusion of Reputation Defender particularly valuable, as it helps ensure your emails bypass spam filters, thereby improving both engagement and deliverability.

Campaigner email templates

Campaigner offers hundreds of customizable email templates in its drag-and-drop builder so you can create stunning email marketing campaigns, even if you have limited design experience. (Source: Campaigner)

Campaigner offers three main pricing tiers and separate plans for e-commerce businesses. Here’s an overview of each plan’s costs and features.

 

PlanPriceFeatures
Essentials$14 per monthDrag and drop editor, full code editor, 900+ templates, geolocation, social Integration, landing pages, suppression lists, basic segmentation, recurring campaigns, conversion tracking, Experiments (A/B testing), 50 MB of CDN media hosting
Advanced$35 per monthEverything in Starter plus removal of Campaigner branding, dynamic content, custom footer, exclusion lists, e-commerce integrations, localization, 1 GB of CDN media hosting
CustomRequires a quoteEverything in Essential plus automation workflows, sales engineering, purchase behavior, API access, static segment sampling.

 

  • Campaigner is highly customizable and supports email automation, personalization, experimentation and reporting.
  • Built-in marketing automation tools enable users to easily segment contacts and optimize email marketing campaigns with minimal manual input.
  • Integrated social media feeds and the option for an SMS add-on bundle support a holistic marketing strategy and makes it easier to unify marketing efforts across multiple digital channels.
  • There is no free plan available for Campaigner and you’ll need to provide your credit card information to access the 30-day free trial.
  • Some customers reported deliverability issues, especially when it came to SMS campaigns.
  • E-commerce customers will have to consider a separate set of e-commerce plans in order to get the most useful features for their businesses.
Klaviyo logo
Editor's Rating: 9.1/10
Visit Site
Links to Klaviyo

Klaviyo allows businesses to send the right consumer messaging across email, SMS and push notifications. It is especially valuable for those seeking an email marketing platform with a strong focus on data-driven marketing. When we tested the software, we liked that the Klaviyo platform was data-first. For example, its AI-powered tools like predictive analytics, personalized product feeds and industry-specific benchmarks, enhance email marketing by delivering highly targeted, data-driven campaigns that boost engagement and revenue. To make this powerful platform even more valuable, Klaviyo seamlessly integrates with 350 third-party applications – no coding needed.

Klaviyo dashboard

Klaviyo’s dashboard shows alerts and overall conversion metric performance. Source: Klaviyo

PlanCostFeatures
Free PlanFreeUp to 500 monthly email sends, 150 free monthly SMS/MMS credits, email support for first 60 days
Email PlanStarts at $20/monthStarting at 5,000 email sends, mobile push notifications, 150 free monthly SMS/MMS credits, email and chat support
Email and SMS PlanStarts at $35/monthEverything in the Email Plan, plus thousands of SMS/MMS credits
  • Klaviyo seamlessly integrates with major e-commerce platforms like Shopify, WooCommerce and Magento.
  • It uses AI to forecast customer behavior, such as predicting a customer’s next purchase date, lifetime value and churn risk.
  • Klaviyo provides industry-specific performance benchmarks.
  • Klaviyo’s pricing scales with the size of your email list, making it expensive for businesses with large subscriber bases.
  • Its advanced features and automation tools can be complex for beginners or those unfamiliar with data-driven email marketing.
  • Klaviyo's customer support can be slow to respond, especially for users on lower-tier plans.

Klaviyo has thousands of user reviews, with a TrustRadius score of 9.0 stars out of 10 and a G2 score of 4.6 stars out of 5. In their reviews, many users highlighted Klaviyo’s useful templates and automation tools, as well as their integration and segmentation capabilities. However, some users noted dissatisfaction with the steep learning curve and limited customer support.

Hubspot logo
Editor's Rating: 9.2/10
Visit Site
Links to HubSpot

HubSpot offers the set of features companies need to overcome two modern marketing challenges – keeping your messaging consistent and getting great results across email, SMS, social media, and other media. Focusing on email first, HubSpot’s range of tools like drag-and-drop email design, optimization features and goal-based templates, make it easy to quickly create and refine campaigns. We were impressed by HubSpot’s customer segmentation tools in particular and how they let you tailor individual emails based on recipient demographics, psychographics and their past interactions. HubSpot’s reporting tools give marketers deep insights into email campaign performance and subscriber data to help them understand which approaches are working and which aren’t. Beyond email marketing, this is a highly-capable, user-friendly one-stop service that shines in helping companies organize and manage coherent marketing campaigns across multiple channels including social media, SEO, blogging and more.

Hubspot personalized email details

With HubSpot, you can personalize emails by including recipients’ names, company names, and many other custom fields Source: HubSpot

HubSpot is a rich and feature-packed CRM with market-leading email marketing software built directly into the platform. The company offers a free plan which allows you to send 2,000 emails per month with HubSpot branding. The following paid-for plans are also available without HubSpot branding:

PlanPriceFeatures
Starter Customer PlatformFrom $15 per monthEverything in the free tier plus:
  • 1,000 marketing contacts
  • Send up to 5 times the number of emails per month on your contact list
  • Email reply tracking
  • Contact management
  • Email health reporting
  • Unlimited email open and click notifications
  • Up to 1,000 custom properties per object
  • 5,000 email templates
ProfessionalFrom $800 per month for three users (each additional user costs $45 per month)Everything in Starter Customer Platform plus:
  • 2,000 marketing contacts
  • 1,200 active and static lists
  • Send up to 5 times the number of emails per month on your contact list
  • Unlimited email automations
  • Dynamic personalization
  • A/B testing
EnterpriseFrom $3,600 per month for 5 users (each extra user seat costs $75 per month)Everything in the Professional package plus:
  • 10,000 marketing contacts
  • 2,000 active and static lists
  • Send up to 20 times the number of emails per month on your contact list
  • Email approvals (emails requiring sign-off from managers)

Bear in mind that you’ll pay extra for more marketing contacts and you may be liable for usage-based fees relating to features like transactional emails, dedicated IPs, API calls, and more. Professional plan subscribers must also pay an onboarding fee of $3,000. Please note that the Professional and Enterprise plans require 12 months’ payment in advance, whereas you can pay monthly on the Starter Professional plan.

  • HubSpot is a robust, feature-packed, elegant and user-friendly email marketing platform whose subscriptions start from just $15 per month per person.
  • There is an impressive range of well-executed tools for each stage of email marketing from content creation through to reporting and analytics.
  • HubSpot doesn’t stop just at email marketing; you can run text marketing, telemarketing, social media marketing, search engine optimization campaigns and more from the one dashboard.
  • You can only send email campaigns to “marketing contacts” on your HubSpot database. You can buy additional marketing contacts for your plan, but this will push up the cost.
  • Many of the most useful features like A/B testing and duplicate data record management are only available on the more expensive tiers.
  • There is no phone support available for companies on the Starter Professional package.

Customer satisfaction with HubSpot is very high with the platform scoring 4.5 out of 5 on Capterra. Users were enthusiastic about the platform as a whole with one reviewer stating that the “email marketing tool is very robust, almost as good as Mailchimp”. One user on Software Advice (also 4.5 out of 5) stated that “HubSpot excels in many things, contact/company/deal creation and association, email marketing, and automation.”

Editor's Rating: 9.4/10

From the reviews we carried out on over 20 email marketing platforms, we found Mailchimp to be one of the easiest to set up and get started with even for email marketing newbies. The AI-powered Intuit Assist tool helps you generate campaign ideas based on your line of business and the goal of your campaign in seconds. We especially liked that Mailchimp has 75 email templates built-in that you can easily customize in minutes. If you’re new to writing ad copy, the Email Content Generator creates the content for your campaign, all using natural language prompts.

Mailchimp interface

Mailchimp lets you build emails using a drag-and-drop interface so you can create your own text and add images and action buttons. Source: Mailchimp

We love Mailchimp’s tools to help you build lists and automate the process of sending campaigns so you and your staff save time. The segmentation tools are among the best in class too, allowing you to create separate lists from your wider database based on factors you choose like location and age so you can better address the unique needs of different customer segments. The easy-to-use reporting and analytics feature is superb and will help you understand better which campaigns generate the best returns. Best of all, for new starters, Mailchimp offers a free plan so you can test-drive the platform before committing to a paid plan.

Mailchimp currently offers a free plan which has a limit of 500 contacts to whom you can send either 500 emails in one day or 1,000 emails over the month. Their paid plans are:

PlanPriceFeatures
EssentialsStarts at $13 per month
  • 5,000 monthly email sends
  • Up to 4 journey points
  • 3 seats
  • 5 audiences
  • 2 roles
  • 24/7 email & chat Support
  • Forms & landing pages
  • Pre-built email templates
  • Email scheduling
  • Limited reporting & analytics
  • A/B testing
  • Single step automations
StandardStarts at $20 per monthAs Essentials plus:
  • 6,000 monthly email sends
  • Up to 20 journey points
  • Generative AI Features
  • Campaign manager
  • 5 seats
  • 5 audiences
  • 4 roles
  • Full reporting & analytics
  • Send time optimization
  • Content optimizer
  • Multivariate testing
  • Comparative reporting
  • Multi-step automations
PremiumStarts at $350 per monthAs Premium plus:
  • 150,000 monthly email sends
  • Premium migration services
  • Unlimited seats
  • Unlimited audiences
  • 5 roles
  • Phone & priority support

Charges for overages apply. For example, sending an extra 2,500 emails per month and adding 500 additional contacts on the Essential plan cost $12.75 per month.

  • While other platforms offer a free plan, Mailchimp’s is more generous in the features it bundles in as well as the number of contacts you can add and emails you can send.
  • We love the user experience in Mailchimp. Every aspect of the platform has been simplified so that it’s easy to build lists and launch campaigns straight away for first-time users.
  • The AI on the platform is excellent, especially for company owners and staff who may not be confident with campaign planning and composing/designing email marketing adverts.
  • We love the send time optimization feature which broadcasts your campaigns on the optimal time or day for greater responsiveness. However, this is not available to Free or Essentials subscribers.
  • Mailchimp counts your unsubscribes as part of your subscriber limit. This means that you’ll be charged for contacts you’re no longer able to send marketing emails to.
  • Although the on-site knowledge base is excellent and the company offers 24/7 email and chat to all users, we were disappointed that phone-based support is only available for Premium plan subscribers.

Mailchimp is popular and valued among its user base, scoring 4.3 out of 5 from over 1,000 reviews on Gartner. One client’s opinion reflected our belief that the platform is excellent for beginners stating that “the template editor is nice to use, even for novices.” Another reported “I’ve had a good run with Mailchimp. It’s loaded with features that make email marketing a breeze”.

Editor's Rating: 9.3/10

For businesses eager to harness the power of AI and automation to optimize their email marketing efforts, GetResponse is the solution. Among the platform’s standout features is an email generator backed by OpenAI, which enables you to use artificial intelligence to quickly craft email messages and subject lines based on your target audience and keywords. To further reduce the time your team spends manually managing email campaigns, you can take advantage of AI-driven email sequences that are automatically sent based on specific triggers. We love that GetResponse’s marketing automation tools also allow users to personalize emails for different segments and recommend products based on customer history and preferences.

Beyond email marketing, GetResponse also capitalizes on the powerfulness of AI with its landing page generator and website builder. We think businesses will further appreciate the vendor’s 99 percent deliverability rate, the opportunity to integrate the system with more than 170 third-party apps and the 24/7 chat support. You can also build your own integrations via an API.

Getresponse AI email writing

GetResponse’s AI-powered email writing tool generates emails in less than a minute. Source: GetResponse

You can sign up for a forever-free account with GetResponse, but after 30 days, you’ll lose access to premium features and will be limited to 500 contacts and other usage caps. For those reasons, we recommend selecting one of the vendor’s paid plans, which are detailed below.

PlanPriceFeatures
Starter: Email Marketing$15.58 per monthUnlimited email marketing, unlimited autoresponders, unlimited landing pages, AI email generator, AI subject line generator, AI writing assistant, custom automation workflow, email and landing page templates, signup forms and pop-ups, mobile app, three users
Marketer: Marketing Automation$48.38 per monthEverything in the Starter plan, plus unlimited marketing automation, abandoned cart recovery, newsletter revenue statistics, promo codes, email delivery scheduling, advanced segmentation, sales funnels, contact scoring, unlimited web push notifications, five users
Creator: Content Monetization$56.58 per monthEverything in the Marketer plan, plus premium newsletters, website builder, webinars, unlimited courses, quizzes and certificates, five users
Enterprise: MAXCustomEverything in the Creator plan, plus fully featured transactional emails, AI product recommendations, SMS marketing, single sign-on, premium priority support, dedicated IP address, mobile push notifications, unlimited users
  • GetResponse customers using its AI email generator saw an 85 percent decrease in email creation time and up to 33 percent more clicks when using the AI writing assistant.
  • Unlike competitors, the vendor offers unlimited email sends at every plan level.
  • The platform can also be used to create monetized newsletter subscriptions and online courses, expanding your revenue sources.
  • GetResponse's entry-level Starter plan allows only one customized automation workflow and limits several of the AI tools to three uses.
  • Only Enterprise users have access to AI-powered product recommendations and phone support.
  • Some customers have complained about long-term, auto-renewing contracts.

With more than 700 reviews, GetResponse has earned a TrustScore of 4.1 stars out of five on Trustpilot. “I’ve been using GetResponse for some years now and have had no issues. What I like is the 24/7 support they offer. They always sort out any query I have,” said one user, who added, “If you are looking for an autoresponder for your business then I can recommend GetResponse.”

constant contact logo
Editor's Rating: 9.4/10

Many SMB owners who start off with a basic email marketing plan eventually want to scale up, but find that plans with the list size, send limits and features they want are too expensive. We found that, out of every email marketing platform we reviewed, Constant Contact achieves the best balance, offering competitively-priced plans with generous sending volumes and a comprehensive range of useful features.

On its reasonably-priced $12 per month entry-level plan, you get access to tools like the system’s excellent customizable drag-and-drop email templates, AI content generator and contact management tools. We loved the extra features on the next tier up, particularly the scheduled email feature allowing you to time campaigns up to a year in advance.

Constant Contact AI system to build campaigns

We think small businesses will really appreciate Constant Contact’s generous send volumes and fair overage fees. The number of monthly emails you can send is 10, 12 or 24 times the maximum list size on your pricing tier. If you reach your monthly send limit, Constant Contact allows you to stay at your current tier instead of making you upgrade to the next one; you simply pay a $0.002 fee per additional send.

Other stand-out features include its excellent segmentation options, subject line personalization and resends to recipients who don’t open your emails. Step up to the top tier and your send limit doubles and you can now use features like dynamic content for super-personalized campaigns and engagement heatmaps showing you which parts of your email recipients viewed the most. With a free 30-day trial, a 30-day money-back guarantee and a range of competitive pricing options, Constant Contact enables SMBs to optimize their email marketing without breaking the bank.

 

PlanPriceFeatures
LiteStarting at $12 per month
  • 1 user
  • 1 GB storage
  • Email sends @ 10 x number of contacts
  • Support: Self-service, live chat & phone
  • Drag & drop email templates
  • BrandKit
  • AI content recommendations
  • Reach and engagement reporting
  • Polls & Surveys
  • Contact management
  • Web sign-up forms
  • 1 automation template
  • Event marketing tools
  • Social media posting and reporting
  • Marketing campaign calendar
  • 300+ integrations
  • Self-service, live chat & phone support
StandardStarting at $35 per monthAll Lite features, plus:
  • 3 users
  • 10 GB storage
  • Email sends @ 12 x number of contacts
  • Scheduled email sends
  • Subject line A/B testing
  • Subject line recommendations and personalization
  • Resend to non-openers
  • Advanced reporting options
  • Newsletter archive
  • 3 automation templates
  • Contact and engagement segmentation
  • Social media ads manager
  • Campaign Builder
PremiumStarting at $80 per monthAll Standard features, plus:
  • Unlimited users
  • 25 GB storage
  • Email sends @ 24 x number of contacts
  • Dynamic content in email
  • Engagement heat map
  • Full access to automation templates, including e-commerce templates
  • Custom automations
  • Dedicated priority support
  • SMS marketing (500 messages per month, text-to-join and reporting features
  • Facebook Lookalike ad targeting
  • Google Ads Manager
  • Revenue reporting
  • SEO recommendations

For all plans, there is an option to add an Inbox Preview for $10 per month. Lite and Standard users also have the option to add on an SMS marketing plan (which comes included with Premium) for a starting price of $10 per month.

You can save 15 percent on subscription fees by paying annually, and there are additional discounts available for nonprofit organizations. Constant Contact offers a 30-day money-back guarantee on all plans.

  • The monthly plans are affordable and all plans, including the entry level plan, offer an impressive range of easy-to-use features.
  • We really like the BrandKit feature that will populate all templates with your brand’s logo, images and color by providing the platform with your URL. It’s available to all subscribers.
  • In addition to your free 30-day trial, Constant Contact will refund you if you decide to close your paid account within 30 days of signing up.
  • The built-in A/B testing functionality only allows you to change subject lines and not the content of the email. There is no multivariate testing, either. Any additional campaign testing must be set up and tracked manually.
  • Unlike some of its competitors, Constant Contact doesn’t have a forever-free plan for SMBs with small contact lists and send volumes.
  • Dynamic content, one of the platform’s break-out features, is only available to customers on the Premium plan.

Constant Contact’s users are impressed with the service, rating it at 3.9 out of 5 on Trustpilot. Clients have been very impressed with the platform’s customer service team in particular. Praise on Gartner is just as effusive where Constant Contact scores 4.5 out of 5. One client noted that “Constant Contact has helped us tremendously in growing our presence and brand. The experience has been really positive, due to its ease of use, thanks to the drag and drop editor it offers to create landing pages, emails, etc.”

Editor's Rating: 9.2/10

Freshmarketer offers three great advantages. First, this well-executed email marketing platform integrates excellently with other platforms allowing you to power campaigns and conversations by SMS, WhatsApp, live webchat, Google Business Messages, Apple Message, and more. You can be on all the channels customers and prospects demand from the one dashboard, overcoming a major challenge for modern client-facing businesses. Second, it’s built on a unified, robust and constantly updated customer database so every team works from the same source of truth. Third, you can up productivity among team members thanks to the platform’s flexible and customizable workflow automations.

For email marketing, Freshmarketer excels. It offers first-class functionality like timed emails, 150 email templates, a drag-and-drop designer and excellent dynamic personalization which allows you to remind customers of their purchase history or products they’ve recently viewed on your site in your campaigns. We loved the intuitive segmenting tool on the platform that means you can precisely target groups of customers with offers they’ll find interesting.

FreshWorks FreshMarketer edtori

The WYSIWYG (what-you-see-is-what-you-get) drag and drop editor in Freshmarketer is intuitive and easy to use. Source: Freshworks Freshmarketer

We also liked the vast marketplace that has hundreds of apps including very well-executed integrations with Shopify and WooCommerce, and found it excellent for emailing online customers using the latest purchasing data. Better still, Freshmarketer plugs directly into the wider Freshworks suite, a very capable CRM platform that bridges the gap between marketing and sales.

There are two Freshmarketer plans – one free and Enterprise costing $15 per month. The free plan offers up to 100 marketing contacts and free marketing campaigns up to twice the number of marketing contacts on your database.

The Enterprise plan offers:

  • 500 marketing contacts
  • Free marketing campaigns up to 20 times the number of marketing contacts on your database.
  • Up to 50 subscription types
  • AI-powered subject line generator, campaign builder, and product recommendation tool
  • AI-powered send time optimization
  • Up to 25 custom domains
  • 100 active marketing journeys
  • AI-powered deduplication and contact scoring
  • API access

In addition to your subscription, there are extra fees for messaging agents to manage chat conversations with customers. There are also charges for more marketing contacts in excess of the plan limit, dedicated IP addresses for email deliverability, and conversion rate optimization services.

  • The drag-and-drop email designer and personalization tools are among the easiest to use on any email marketing platform.
  • The tight integration with both Shopify and WooCommerce is ideal for companies wanting to use email marketing to generate revenues from online customers.
  • Dynamic personalization (tailored content) is one of email marketing’s most effective features and you can access it at a much lower cost on Freshmarketer compared to other platforms.
  • The number of marketing contacts on the Enterprise plan is very low at 500 which could make the platform uneconomic for larger businesses.
  • A/B testing and other useful features like personalization, polls and feedback, and personalization are not included in plans and will add to your costs.
  • Customer service is generally excellent however it’s currently offered on a 24/5 basis, not 24/7.

Freshmarketer wins the seal of approval for the platform from its customers on review sites. Scoring 4.4 out of 5 on Capterra, one user mentioned the following features as its main pros – “heatmaps, session replay, A/B testing, among others (as well as) integrated form analysis”. On G2 (4 out of 5), the platform’s three most popular features were its integrations, email marketing, and ease of use.

What is Email Marketing and How Does it Work?

Email marketing offers a direct line to your audience’s inbox, allowing you to send a wide range of content and keep your brand at the top of their mind. This content may include promotional content, information about sales and discounts, and behaviorally triggered emails like reminders to check out when a user leaves products in their e-commerce cart.

Email marketing software transforms what could be a tedious manual process into a streamlined operation. Import your contact list, segment your audience by interests or behavior and create professional-looking emails using drag-and-drop builders — no design experience required. Planning to send a monthly newsletter? Save it as a template and maintain consistent branding without starting from scratch each time.

Modern email marketing platforms go beyond basic sending. Look for compliance features that protect you by ensuring subscribers have genuinely opted in to hear from you. The best platforms now leverage AI to optimize your content for higher conversions and personalize messages to individual recipients, turning generic blasts into relevant conversations that drive engagement.

What Are the Benefits of Using Email Marketing?

Email marketing is an effective, low-cost method of communicating with your customers and building loyalty to your company when executed correctly.

“Give compelling content and a valid reason for the customer to open your email and act the way you want them to,” Cross said. “If you provide valuable and relevant content that addresses the customer’s needs and interests, you’ll attract and retain customers.”

Here are just a few of the benefits of investing in a software solution for email marketing.

1. Easily manage your campaigns and contacts.

An email marketing service provides a centralized place to create, manage and analyze your email campaigns. The software manages the entire process of creating and sending your email campaigns. Instead of juggling spreadsheets and manual sends, you get automated workflows and real-time performance feedback—all in one place.

2. Improve click-throughs and engagements on your website.

A professionally designed email doesn’t just look good — it drives higher clickthrough rates. When your emails are polished and relevant, subscribers are far more likely to click through to your website, boosting both traffic and engagement.

3. Provide personalized, one-to-one communications with your customers.

Today’s customers expect content that is personally tailored to them, rather than a rote email going out to a company’s entire customer base. Email marketing services allow you to segment your customers by qualifiers such as age, gender, location and interests to help you customize your messages.

4. Integrate email with your other digital marketing channels.

The best email platforms integrate seamlessly with your social media channels, letting you embed links or social feeds directly in your emails. This cross-channel approach amplifies your brand awareness and keeps customers engaged across multiple touchpoints.

Bottom LineBottom line
Choosing the right email software for your business can be a tough task, so it is important to prioritize your needs and the benefits you are looking for to make sure the software you ultimately select hits all of those notes.

How Much Will an Email Marketing Service Cost?

The plans we reviewed range in price from $10 per month for 500 contacts to $4,000 per month for 1 million contacts. Email marketing services that do not offer a free version often allow you to sign up for a free trial so you can test out the software and see how it works for you. The services we examined offer trials ranging from 14 to 60 days.

Most email marketing service providers charge a monthly subscription fee based on the number of contacts you want to engage with and the number of emails you plan to send. Plans then vary further based on specific features. Some providers offer free versions of their software with limited features, subscribers and sends, which are a great way for businesses to try out email marketing risk-free.

For businesses that only occasionally need an email marketing service, some providers offer per-email or pay-as-you-go pricing. This is a flexible option, as you pay only for what you use rather than paying the same amount each month for a subscription that may largely go to waste.

TipBottom line
Use as many free trials as you can during your search to determine which email marketing service is right for your business. Pay attention to how easy it is to design emails and build your audience with each platform.

How to Choose an Email Marketing Platform

Choosing the right platform requires balancing your must-have features against real-world usability. Here’s how to narrow down your options without getting overwhelmed:

Start with your non-negotiables.

Before browsing vendor websites, list your essential requirements. Do you need to import an existing contact list from a spreadsheet? Is audience segmentation critical for organizing leads versus repeat customers? Would a drag-and-drop builder be easier than coding emails from scratch?

“Our research was directed by the identification of our unique needs in email marketing at the outset of the journey,” explains Jake Munday, co-founder and CEO of Custom Neon. “We were able to determine real-world application and satisfaction levels by reading through many customer reviews and case studies.”

Common priorities include available features and ease of use, balancing advanced functionality with complexity, customization and scalability for growing businesses, responsive customer support, and cost-effective pricing.

Build your shortlist strategically.

Research the leading platforms and create a preliminary list based on your priorities. If budget is your primary concern, only include options that deliver your must-have features at a price that makes sense. If integration with your existing CRM is critical, cross off any platforms that don’t support it.

“We initially carried out an exercise to look at as many different options as possible and compare costs for different numbers of subscribers and to check if specific automation functionality we needed was available,” says Laura Grant, marketing manager at Bluesky Solutions. “This then gave us a small shortlist of potential software which we looked at in more detail.”

Focus on functionality without sacrificing usability.

Great features mean nothing if the platform is too complex to use effectively. Look for robust analytics, segmentation tools, and customization options, but make sure they’re accessible without a steep learning curve.

“To support targeted campaigns, we searched for strong analytics, extensive segmentation tools and customization choices,” Munday notes. “Ease of integration with our existing CRM and e-commerce platforms was crucial to streamline our workflows.”

The challenge is finding the sweet spot.

“I needed robust automation, list segmentation capabilities and integration with other tools like my CRM and analytics platform,” says Bassem Mostafa, market analyst and owner of GlobeMonitor Market Research Agency. “Some tools were feature-rich but overly complex, so it was essential to strike the right balance.”

Don’t chase the cheapest option; chase the best value.

“I personally recommend that while considering tools, think about long-term value, not just the initial price,” advises Tom Jauncey, CEO of Nautilus Marketing. “A more expensive option may save you time and ramp up your results in the longer term.”

Test extensively before committing.

Once you’ve narrowed your list, schedule live demos and sign up for every free trial available. Live demonstrations let you ask questions and see the platform in action, while hands-on trials reveal how the software performs in your actual workflow.

“There is no replacement for a good free trial,” emphasizes Brandon Rollins, founder and CEO of Pangea Marketing Agency. “Blog posts, reviews, and even videos are all helpful, but there’s no replacement for using the tool directly and seeing if [it] does exactly what you need it to do.”

Don’t overlook onboarding support.

Email platforms are generally straightforward, but implementation support makes the process smoother—especially if you’re new to email marketing or migrating a large contact list. Look for dedicated account managers or comprehensive self-service resources.

“For some platforms, the onboarding process was included in the demo, which gave me a good sense of how much support and training was available,” Mostafa notes.

Measure results after launch

Treat your first month as an extended trial period. Track key metrics to confirm the platform is delivering results. You should see improvement in open rates, click-throughs, and conversions—especially if you’re upgrading from manual processes.

“When it came to user engagement, conversion rates, and deliverability, the platform [we chose] not only met but surpassed our expectations,” says Munday. “Customer satisfaction and retention have significantly improved as a result of the capacity to produce tailored content depending on user behavior and preferences.”

If metrics remain flat or decline, audit your usage. Are you segmenting properly? Crafting compelling subject lines? Ensuring emails reach inboxes rather than spam folders? If you’re following best practices but still seeing poor results, it may be time to reconsider your choice.

TipBottom line
Define specific campaign goals during the planning phase so you can focus your efforts and accurately measure success.

What Are Some Features of an Email Marketing Platform?

As you compare email marketing services, look for these core features:

A/B Testing

Many services offer A/B testing, which is the ability to test out various components of an email message to see what will resonate more with your audience. Before you do, it is important to understand how A/B testing works. A specific example is to try out two different subject lines. You can send a portion of your email list one subject line and another section of your list a different subject line. Whichever gets more engagement can be used for the majority of your audience.

iContact A/B testing

Test different iterations of email campaigns with A/B testing. Above is multivariant testing on the iContact platform. Source: iContact

Drag-and-Drop Email Design Tools

Most services provide a user-friendly drag-and-drop tool that allows you to customize your emails or customizable premade templates. Some providers have templates that show you how your email will look on multiple devices (laptops, tablets and mobile phones), which can help you design a flexible and responsive email.

Analytics and Reporting

The ability to measure your campaigns’ performance is critical to understanding your ROI. Email marketing services typically include a detailed analytics platform that provides information such as your open rates, click-through rates, bounce rates, audience geolocation, conversions and customer behavior trends. Some integrate with Google Analytics, while others provide their own analytics platforms that present the info in easy-to-read charts and graphs.

Marketing Automation

With marketing automation features, you can configure your email marketing software to automatically send targeted emails to certain customers when they take a specific action. For example, if a visitor to your website signs up to receive emails from you, a marketing automation workflow triggers a welcome email to go to that customer’s inbox.

FYIDid you know
Marketing automation can be an effective timesaver, and many email marketing services offer ways to make automated emails more personal, which leads to higher engagement and ROI.

Segmentation

Segmentation is another helpful way to improve email deliverability to your audience by grouping or tagging them by factors like age, location, gender, industry or interests. Email segmentation allows you to target different groups rather than sending one mass email that may not be relevant to your entire customer base.

 

Campaigner segmentation

Most platforms, like Campaigner above, allow you to segment your data allowing you to send campaigns with different offers to different audiences based on their interests. Source: Campaigner

Contact Management

A contact management tool helps you acquire, sort and manage email contacts. It also provides features like automatic deletion of dead or duplicate contacts, importing, exporting, grouping, and integrating with other management tools, like a CRM or CMS.

Social Media Integration

Integrating your social media with email marketing helps make the most of multichannel marketing by providing more information about your customers as well as more opportunities for them to see messages from you. You’ll be able to grow your contact list, schedule posts and track your followers’ engagement to determine what’s popular.

AI-Driven Technology

Some email marketing experts also advise looking for AI-powered features. “AI can definitely help with efficiencies like automation, writing content, optimizing send times, subject lines and other content,” said Jon Cross, CEO of All In One Email.

Dave Charest, director of small business success for Constant Contact, agreed. “AI makes digital marketing easier for small businesses to create, design and send their campaigns. Spending less time on marketing minutiae helps you get back to running other aspects of your business,” he said. Charest pointed out that his platform’s AI technology “lets our customers use our almost 30 years of marketing experience to create campaigns and reach the right customers with the right messages … It’s certainly enabled some new outcomes we’re able to offer our customers.”

However, Cross cautioned such tools are “still fairly new” and said “not to rely on it too much” if your experience with using AI is limited. Users need to “know what they’re doing enough to know when [or] if AI steers them in the wrong direction.”

Is Email Marketing Worth It?

Email marketing is worth the investment when done properly, driving an estimated $36 to $42 return for every $1 spent, based on our analysis of multiple sources. Almost half of all users buy from a marketing email at least once per month, meaning this channel is effective for generating revenue through direct sales — and thanks to email marketing reports, you can track these sales. An additional 60 percent of users have said that marketing emails have influenced their purchases, so even if you don’t drive direct sales from your email marketing campaigns, you may still be nurturing leads in a meaningful way that leads to a sale later on.

Of course, email marketing is only worth it if you do it correctly. That means understanding the best practices surrounding email marketing and sticking to them from day one.

Best Practices for Email Marketing

To make the most of your email marketing campaigns, make sure you’re adhering to email best practices. These include meeting basic compliance requirements and setting your email content up for success.

Use the double opt-in method

The double opt-in method requests that subscribers not only check a box saying they’d like to receive email content from you, but also asks them to confirm their subscription with a second step. This leaves no doubt that they have agreed to receive marketing messages from your brand, an increasingly important element in the era of data privacy laws like the EU’s General Data Protection Regulation (GDPR) or the California Consumer Privacy Act (CCPA).

Create a triggered welcome email

Welcome emails don’t only let subscribers know they’ve successfully signed up — they’re also one of the most engaging types of emails. Welcome emails achieve exceptional engagement, with open rates around 80% – 84% and click-through rates of approximately 17% – 27% – dramatically outperforming standard marketing emails, according to 2026 estimates gathered from multiple sources by MailMend.

Segment your audience

Your email contact list likely contains several types of users, so you should segment them accordingly to better target them with relevant content. Some may be leads that have never purchased your products or services before, while others may be repeat customers. Others still might be lost subscribers that you’re trying to win back. By segmenting your audiences, you can direct the most relevant content their way and boost opens and clicks.

Cull inactive subscribers

If you’ve been sending email marketing content to subscribers who haven’t opened a single message in a year, it may be time to remove them from your list. These inactive subscribers drag down your metrics and provide no value to your email marketing campaigns, so frequently revisit your list and identify opportunities to cull inactive subscribers or dead email addresses.

Create engaging subject lines

Engaging subject lines that make users want to open an email are critical. If they don’t open your email, there’s no chance they’ll convert by clicking through to your website or making a purchase — so try to hook their attention with a grabby email subject line.

Personalize email content

By personalizing email content to include a user’s name and surface products they were browsing in your store, for example, you can boost open and engagement rates. Many email marketing platforms include tools that support content personalization, so consider these when making a buying decision.

What Are Some Alternative Email Marketing Services?

If our best picks above don’t suit your business, these fine alternatives might.

Active Campaign

Many e-commerce businesses find email marketing challenging because they can’t base their campaigns on live customer data like order history or pages visited. So, instead of offering products their customers are most likely to want, they’re forced to rely on generic or outdated information. Active Campaign solves this through its smart integration with 850 ecommerce platforms, including major vendors like Shopify, WooCommerce, and BigCommerce.

This eliminates guesswork for marketing teams as they get data on campaign performance and customer behavior. Active Campaign’s e-commerce dashboard helps them to create personalized and highly targeted email campaigns quickly from the platform’s selection of 125 customizable templates. We were impressed by the volume of emails you can send to – an unlimited number up to 250,000 contacts.

Active Campaign includes automation tools like ‘goal actions’ and ‘go actions,’ which take email recipients to the next sales stage if they choose an action like making a purchase before, for example, a drip campaign ends. Marketing teams can also score contacts based on factors like location and email opens as well as build specific landing pages for campaigns to generate better responses.

iContact

The steps between plans offered by many email marketing platforms can be steep. For example, moving from paying for 2,000 emails and contacts up to the next plan with 10,000 emails or contacts pushes the price, denting campaign profitability until subscriber numbers increase.

iContact allows you to start with a free plan and scale up gradually (750, 1,500, 2,500, 5,000 contacts) with small and manageable increases in price ($8.50, $27, $41, $73). We also appreciate how iContact makes every feature available to subscribers at all levels.

There was a lot else we really liked about this platform when we reviewed it. The drag-and-drop email designer was one of the easiest we’ve used. Their library of customizable and professional templates is also very generous. Sending out campaigns takes no time. We also thought the real-time reporting on live campaigns was excellent, which gives marketing teams instant insights into engagement and revenue.

Salesforce Marketing Cloud Next

When creating campaigns across channels like email, SMS and social media, marketing teams need a way to coordinate customer data, personalization and automation from one place. We were impressed by how Salesforce Marketing Cloud Next brings together CRM data, AI-powered campaign creation and customer journey orchestration to help businesses deliver more consistent experiences across every customer touchpoint. Because it’s built on Salesforce CRM and part of Agentforce Marketing, marketers can create more personalized campaigns using real-time customer data.

We especially liked how Marketing Cloud Next combines AI with marketing automation. Agentforce can help marketers generate campaign content, build audience segments and create customer journeys, while Salesforce CRM data helps personalize messaging based on customer behavior and engagement history. The platform also makes it easy to measure campaign performance and optimize marketing efforts over time.

Marketing Cloud Next’s analytics and reporting tools give businesses a clear view of campaign performance across channels, while the broader Salesforce ecosystem allows organizations to expand the platform with products for marketing intelligence, personalization and more as their needs grow.

Click here for our Salesforce Marketing Cloud Next review.

Methodology

To determine the best email marketing services and survey software on the market, our team of marketing experts and software analysts evaluated an initial list of 25 platforms.

We narrowed this list down by examining key criteria such as pricing plans, available features, onboarding support and customer service. We also took a look at customer reviews to see what real entrepreneurs had to say about their experiences with each platform. We used these insights to narrow our initial list down and select the email marketing software we wanted to put through more in-depth testing.

After narrowing our list down to 14, we participated in live demonstrations and signed up for free trials with each company to test out their offerings firsthand. We asked pointed questions of company representatives and put their platforms to the test in real-world situations. Ultimately, we chose six email marketing platforms as our top recommendations. Our experts and analysts studied each solution’s functionality and evaluated the products on nearly 30 factors.

These factors were weighted differently in our overall conclusion. The weights were determined based on how much business owners prioritize these criteria when shopping for business software and services and making purchasing decisions.

  • Pricing (30%): Our experts and analysts compared and contrasted each vendor’s plans, judging which packages offered the best bang for your buck. They took into account monthly subscription fees, the number of contacts and email sends allowed, pay-as-you-go options, and the quality of free versions and free trials.
  • Features (25%): We looked for standard email marketing functions like email builders, contact management tools, A/B testing abilities, workflow automations and analytics. We also assessed the available integrations and awarded extra points for advanced services, like AI tools for generating email content, customizing campaigns and analyzing metrics.
  • Ease of Use (20%): We tested the software ourselves, gauging each solution’s learning curve, user-friendliness and customization options. We also considered whether the platform included easy-to-use survey tools and if the vendor offered a fully featured mobile app for executing email marketing tasks on the go.
  • Customer Service (15%): We evaluated the range of customer service options, including whether phone assistance was provided with all package tiers. We also examined each vendor’s online resources for businesses interested in self-guided help.
  • Integrations (10%): Email marketing software can tie in with your tech stack’s other marketing tools and business software. We gave extra points to platforms that offered extensive pre-built integrations with some of the most popular business software on the market.

Based on these criteria, we not only determined which email marketing services and survey software our readers could trust but also the ways in which each solution could best serve different business needs. Some platforms were better at certain tasks than others or more suited to a particular type of company. These takeaways informed the “Best for” use cases you see on this page.

To learn more about our methodology, see our full editorial process.

FAQs

There are several types of email marketing. The most common type is the informational newsletter, which provides general company news and updates, transactional emails that are part of the sales or billing process (order and shipping confirmations, receipts, invoices, etc.), and behavioral emails that are sent after a subscriber takes a certain action on your website (signs up for a mailing list, abandons their cart, sends an inquiry, etc.).

Any business that wants to build strong customer relationships and improve their website traffic and revenue for a relatively low cost should consider email marketing.

Yes, email marketing software integrates with other business software, such as top CRM systems and other marketing tools. These integrations create a seamless connection that allows these individual platforms to share data, reducing the need for double-entry and the risk of human error, as well as keeping all stakeholders apprised of new developments in real time.

Yes, you can automate email marketing blasts so they’re scheduled for delivery ahead of time. You can set these up to run once or on a recurring basis. However, when setting up automated email marketing blasts repeatedly, you should periodically check the content to ensure it remains accurate and up to date.

Yes, email marketing is worthwhile for almost every business and can generate a return on investment when best practices are followed. Many users make purchases directly through email marketing content and even more are influenced by this content toward making a purchase at a later date.

Yes, many email marketing platforms now offer AI tools like generative content creation (including text and images) and AI-powered personalization features. AI helps automate some key functions and provides guidance on optimizing your email marketing campaigns, making it an ideal companion for entrepreneurs conducting email marketing for the first time and those who simply want to save time.

Did you find this content helpful?
Verified CheckThank you for your feedback!
Mark Fairlie
Written by: Mark Fairlie, Senior Analyst
Mark Fairlie brings decades of expertise in telecommunications and telemarketing to the forefront as the former business owner of a direct marketing company. Also well-versed in a variety of other B2B topics, such as taxation, investments and cybersecurity, he now advises fellow entrepreneurs on the best business practices. At business.com, Fairlie covers a range of technology solutions, including CRM software, email and text message marketing services, fleet management services, call center software and more. With a background in advertising and sales, Fairlie made his mark as the former co-owner of Meridian Delta, which saw a successful transition of ownership in 2015. Through this journey, Fairlie gained invaluable hands-on experience in everything from founding a business to expanding and selling it. Since then, Fairlie has embarked on new ventures, launching a second marketing company and establishing a thriving sole proprietorship.